{"id":17090,"date":"2026-03-26T16:10:02","date_gmt":"2026-03-26T14:10:02","guid":{"rendered":"https:\/\/www.automotive-today.ro\/?p=17090"},"modified":"2026-03-26T16:10:04","modified_gmt":"2026-03-26T14:10:04","slug":"bmw-group-builds-new-competence-centre-circularity-at-wackersdorf-site","status":"publish","type":"post","link":"https:\/\/www.automotive-today.ro\/index.php\/2026\/03\/26\/bmw-group-builds-new-competence-centre-circularity-at-wackersdorf-site\/","title":{"rendered":"BMW Group builds new Competence Centre Circularity at Wackersdorf site"},"content":{"rendered":"\n<p>The BMW Group is relocating its Recycling and Dismantling Centre (RDC) from Unterschlei\u00dfheim to the company\u2019s Wackersdorf site, with a significant expansion. At the new location, a technologically state-of-the-art competence centre for circularity is being built, advancing vehicle dismantling and recycling expertise for the future. Commissioning is scheduled for early 2029.<\/p>\n\n\n\n<p>\u201cThe circular economy is a key element of the BMW Group\u2019s corporate strategy,\u201d says J\u00f6rg Lederbauer, Vice-President Circular Economy, Spare Parts Supply High Voltage Battery and Electric Powertrain at the BMW Group. \u201cOur new competence centre in Wackersdorf will be a core component of our circular value chain and will help make the mobility of the future more resource efficient. We want to find the best way to keep materials in the cycle, ensuring that resources retain their value for further use in the long term. This will also reduce our dependence on primary raw materials. At the same time, the use of high-quality secondary materials will continue to significantly lower our vehicles\u2019 carbon footprint.\u201d<\/p>\n\n\n\n<p>For more than 30 years, at its current location in Unterschlei\u00dfheim, near Munich, the BMW Group Recycling and Dismantling Centre (RDC) has developed methods aimed at achieving significant advances in the recycling of parts and the recovery of materials, and has tested them in practice. The insights gained by the RDC into the recyclability of components and materials, in line with Design for Circularity principles, are already incorporated into product development at the BMW Group. These insights also feed into the cooperation with PreZero, which the BMW Group recently entered into in order to leverage the strategic and economic potential of the circular economy in end\u2011of\u2011life vehicle recycling.&nbsp;<\/p>\n\n\n\n<p>The recycling industry\u2019s global network also benefits from the work of the RDC. Around 3,000 businesses in 32 countries rely on a shared recycling database for information on how recyclable components can be disassembled cost-effectively and valuable materials efficiently recovered.<\/p>\n\n\n\n<p>At the future site, process, material and technology development will be even more closely integrated with vehicle recycling operations. The new scope of activities at the Competence Centre Circularity includes the recycling of hydrogen vehicles, automation of dismantling processes and development of expertise in innovative shredding and sorting technologies.<\/p>\n\n\n\n<p>The BMW Group sees Wackersdorf as the ideal new location for the Competence Centre Circularity, with BMW Group Plant Wackersdorf having embodied flexibility for decades: Housing cockpit production, the Rolls-Royce door and flap production centre, parts supply for overseas plants and the battery testing centre, the site has wide-ranging expertise and is firmly established within the BMW Group network.<\/p>\n\n\n\n<p>\u201cIn recent years, the company has set a decisive course for the future of the Wackersdorf location. Throughout this process, the entire plant team has consistently demonstrated flexibility. Building the competence centre for circularity here provides our site with a broader foundation. In this way, we are tapping into an attractive, future-oriented area of activity,\u201d says Stefan Betz, head of BMW Group Plant Wackersdorf.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The BMW Group is relocating its Recycling and Dismantling Centre (RDC) from Unterschlei\u00dfheim to the company\u2019s Wackersdorf site, with a significant expansion. At the new location, a technologically state-of-the-art competence centre for circularity is being built, advancing vehicle dismantling and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":17092,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[48,22,24,1133],"tags":[],"_links":{"self":[{"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/posts\/17090"}],"collection":[{"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/comments?post=17090"}],"version-history":[{"count":1,"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/posts\/17090\/revisions"}],"predecessor-version":[{"id":17093,"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/posts\/17090\/revisions\/17093"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/media\/17092"}],"wp:attachment":[{"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/media?parent=17090"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/categories?post=17090"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.automotive-today.ro\/index.php\/wp-json\/wp\/v2\/tags?post=17090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}